| Client: | UAE Armed Forces |
| Consultant: | UAE Corps of Engineering |
| Location: | Sweihan; Abu Dhabi |
| Started: | June, 1980 |
| Completed: | October, 1982 |
| Value: | Dhs 225,000,000 |
The construction of a complete camp for the armed forces covering 120,000 square meters of built-up area on an area of 1,500,000 square meters.
The project included the following:
Accommodation, schools, gymnasium, Olympic size swimming pool, brigade headquarters, mosque for 600 people, motor transport centres, quartermaster complex, brigade gate guard, lecture hall, cinema and library.
Driver training simulator building, squadron office building, regimental store building, tank and vehicle workshop, weapons and armoury, stores, hospitals, medical centre, officers mess, squash court and playground.
Also included the necessary earthworks (1,500,000 cubic meters of excavation and backfilling) construction of 30,000 square meters of road having flush and raised kerbstones with all the
| Civil Value: | Dhs 141,704,431.00 |
| Peak Manpower: | 300 |
Mechanical Details
An air conditioning system of 4,500TR capacity, consisting of the following:
| Mechanical Value: | Dhs 31,405,000.00 |
| Peak Manpower: | 65 |
Electrical Details
| Electrical Value: | Dhs 51,890,569.00 |
| Peak Manpower: | 18 |