Reverse Osmosis Plant Offsite and Miscellaneous Works

Reverse osmosis plant

Client: Water and Electricity Department (WED) of Abu Dhabi
Consultant: DSS Engineers Inc.
Location: Abu Al Abiyad Island, Abu Dhabi
Started: August, 1987
Completed: April, 1988
Value: Dhs 3,353,350

 

The installation and commissioning of the following items:

  • Chemical laboratory building and all other associated civil works.
  • 600 mm diameter GRP seawater intake pipe, with marker buoy.
  • Equipment foundation and chemical laboratory, 250cm concrete and 50 ton steel structure.
Civil Value: Dhs 299,258.00
Peak Manpower: 50

 

Mechanical Details

  • Offshore seawater intake screen and associated 600mm diameter GRP piping.
  • Airblow and chlorination pipework.
  • Two seawater pumps, capacity of 897 cubic meters per hour at forty meters head.
  • Two freshwater pumps, capacity of twenty cubic meters per hour
  • Two priming pumps.
  • Dosing and vacuum pumps.
  • Piping system of GRP, PVC, MS and SS.
  • Chemical dosing equipment.
Mechanical Value: Dhs 2,449,416.00
Peak Manpower: 12

 

Electrical Details

Complete electrical and instrumentation system including:

  • 11KV transformer, 11KV fused switch, power and control cabling and other associated electrical works.
Electrical Value: Dhs 604,676.00
Peak Manpower: 4

 