Relocation of 14 Diesel Generators and One Gas Turbine

Relocation of 14 Generators

Client: Water and Electricity Department (WED)
Consultant: Ewbank Preece Ltd.
Location: Liwa, Mirfa, Dhabiya and Madinat Zayed
Started: October, 1988
Completed: March, 1990
Value: Dhs 16,491,543

 

The construction of reinforced concrete foundations for fourteen generating sets, (of which two were 4 MW, ten were 2.1 MW and two were one MW), for radiators, transformers and for a frame 5 John Brown 21MW gas turbine.

Supply and installation of two 1,220 square metre steel fabricated buildings for switchgear, control panels and main engine hall at Liwa. Reinforced concrete buildings for switchgear, control panels and pump house at all locations.

Supply and installation of a 3,500 square metre steel structure building to serve as a heavy equipment and vehicle maintenance workshop, compete with spare parts stores and offices.

Construction of a power house building at Liwa together with all necessary foundations for the diesel generator and gas turbine. Construction of a 3,000 square metre repair workshop.

Civil Value: Dhs 11,510,000.00
Peak Manpower: 450

 

Mechanical Details

The project consisted of the decommissioning, dismantling, relocation, installation, testing and commissioning of the following:

  • One frame no 5 John Brown 21 MW gas turbine from Abu Dhabi to Liwa, complete with the cooling system, air intake, auxiliary transformers, auxiliary switchgear, fuel skid, free standing remote
  • The supply and installation of internal and external lighting, air conditioning and venting of the associated buildings.
  • Two 4 MW diesel generator sets from Sadiyat Island to Liwa, complete with high and low voltage panels, switch gear,
  • Construction of the power house at Liwa and supply and installation of all electro mechanical services such as A/C, lighting, fire alarms, plumbing and drainage.
Mechanical Value: Dhs 4,981,543.00
Peak Manpower: 12

 

Electrical Details

Three 2.1MW generating sets from Sweihan Village to Mirfa, complete with all electrical panels, switch gear, fuel system, transformers, and the supply and installation of electro-

Seven 2.1 MW diesel generating sets from the old power house at Madina Zayed to the new power house, 10 km away, complete with all electrical panels, switch gear, fuel system, transformers

Two 1.0 MW generating sets from Liwa power station to Dhabiya power station, complete with all electrical panels, switch gear, fuel system, transformers and electro-mechanical services.

Electrical Value: Dhs 0.00
Peak Manpower: 12

 