| Client: | Water and Electricity Department (WED) |
| Consultant: | Ewbank Preece Ltd. |
| Location: | Liwa, Mirfa, Dhabiya and Madinat Zayed |
| Started: | October, 1988 |
| Completed: | March, 1990 |
| Value: | Dhs 16,491,543 |
The construction of reinforced concrete foundations for fourteen generating sets, (of which two were 4 MW, ten were 2.1 MW and two were one MW), for radiators, transformers and for a frame 5 John Brown 21MW gas turbine.
Supply and installation of two 1,220 square metre steel fabricated buildings for switchgear, control panels and main engine hall at Liwa. Reinforced concrete buildings for switchgear, control panels and pump house at all locations.
Supply and installation of a 3,500 square metre steel structure building to serve as a heavy equipment and vehicle maintenance workshop, compete with spare parts stores and offices.
Construction of a power house building at Liwa together with all necessary foundations for the diesel generator and gas turbine. Construction of a 3,000 square metre repair workshop.
| Civil Value: | Dhs 11,510,000.00 |
| Peak Manpower: | 450 |
Mechanical Details
The project consisted of the decommissioning, dismantling, relocation, installation, testing and commissioning of the following:
| Mechanical Value: | Dhs 4,981,543.00 |
| Peak Manpower: | 12 |
Electrical Details
Three 2.1MW generating sets from Sweihan Village to Mirfa, complete with all electrical panels, switch gear, fuel system, transformers, and the supply and installation of electro-
Seven 2.1 MW diesel generating sets from the old power house at Madina Zayed to the new power house, 10 km away, complete with all electrical panels, switch gear, fuel system, transformers
Two 1.0 MW generating sets from Liwa power station to Dhabiya power station, complete with all electrical panels, switch gear, fuel system, transformers and electro-mechanical services.
| Electrical Value: | Dhs 0.00 |
| Peak Manpower: | 12 |