| Client: | US State Department |
| Consultant: | None |
| Location: | Abu Dhabi |
| Started: | August, 1986 |
| Completed: | January, 1987 |
| Value: | Dhs 943,975 |
A complete security system for the Embassy and ambassador's residence, against vehicles and/or pedestrians.
The system is in two sections:
Protection of the enclosure by concrete walls and a barrier outside the existing embassy and residence boundary wall on three sides and inside the existing boundary wall on two sides. A 3m high steel fence is fixed at the top of the existing wall.
The front side of the embassy is protected by a system called a "Power Arrested Vehicle Barrier" which is mechanically operated and prevents the entry of any unauthorized vehicle.
In addition, closed circuit cameras, including all the necessary electrical works were supplied and installed.
| Civil Value: | Dhs 480,400.00 |
| Peak Manpower: | 20 |
Mechanical Details
All associated mechanical works
| Mechanical Value: | Dhs 103,575.00 |
| Peak Manpower: | 6 |
Electrical Details
All associated electrical works
| Electrical Value: | Dhs 360,000.00 |
| Peak Manpower: | 6 |