| Client: | Al Nahda Investment |
| Main Contractor: | Pivot |
| Project Manager: | Foresight Project Management |
| Consultant: | Hoops and Hilgendorff |
| Location: | Abu Dhabi |
| Started: | May 2008 |
| Completion Date: | November 2009 |
| Value (Dhs.): | 92,462,351 |
The construction, completion, commissioning, maintenance of a mixed-use commercial and residential tower. It will have four basement floors, ground and mezzanine floors, fifteen typical floors and a roof floor. The building will be clad with aluminium and glass curtain wall. The contract includes all civil and electro-mechanical works.
Civil Details
| Total Plot Area: | 372 m2 |
| Total Built-Up Area: | 24,295 m2 |
| Concrete: | 14,419 m3 |
| Formwork: | 44,632 m2 |
| Rebar: | 2,224,540 kg |
| Blockwork: | 7,217 m2 |
| Plastering: | 31,753 m2 |
| Tiling Works: | 5,084 m2 |
| Elevators: | 3 |
| Civil Value (Dhs.): | 69,789,803 |
| Peak Manpower: | 223 |
Mechanical Details
The mechanical works for the project feature the following:
All sanitary fittings. Cold water supply system including storage tanks and distribution system to all fixtures and equipment. Hot water supply to all fixtures. Air- conditioning works and Fire fighting systems.
| Mechanical Value (Dhs.): | 12,645,674 |
| Peak Manpower: | 37 |
Electrical Details
The electrical works for the project feature the following:
LV panel and switchgear. Submain distribution cabling Power accessories and switchgear. Lighting points, wiring, switches. Analogue addressable fire alarm system. MATV/satellite antenna and distribution cabling. CATV system, Telephone system including cable trays, wiring, trunking, conduiting, outlets, boxes and accessories. Lightning protection system and Earthing network.
| Electrical Value (Dhs.): | 10,026,874 |
| Peak Manpower: | 32 |
| Total Manpower: | 292 |