Khalifa Humaid Abdalla Al Rumaithy Building

Client: Department of Social Services and Commercial Buildings
Consultant: Al Meedan Consultants
Location: Abu Dhabi
Started: June, 1995
Completed: November, 1997
Value: Dhs 36,952,540

 

The project involved all civil and electro-mechanical works for a building on a plot size of 80' x 80' (24.38 x 24.38 m), consisting of a ground floor, mezzanine, 18 typical floors and one mechanical floor.

The building is a reinforced concrete structure supported by piles, and has a total floor area of 11,100 sq.m. It is intended for residential use and contains 4 flats on each of the 18 floors for a total of 72 flats.

The external façade is composed of pink granite and pink flamed granite and an aluminium and double glazed reflective glass curtain wall.

Civil Value: Dhs 26,828,828.00
Peak Manpower: 100

 

Mechanical Details

The central air-conditioning system includes:

  • Four 198 ton air-cooled chillers;
  • Two air handling units;
  • Four roof-mounted extract fans of 5,000 cu. m./hr;
  • One ducted in-line extract fan of 245 cu.m/hr;
  • Seventy two in-line ducted extract fans of 345mr/hr;

All plumbing and drainage services:

  • All pumps;
  • Water heaters; hot and cold water system;
  • A fire fighting and sprinkler system;
  • A central LPG system.
Mechanical Value: Dhs 6,120,032.00
Peak Manpower: 20

 

Electrical Details

The supply, installation, testing and commissioning of:

  • Small power and lighting including their conduiting, wiring, wiring accessories and lighting fixtures.
  • Power distribution including main distribution boards, sub-main
  • DBS, DBS, consumer units, isolators, starters and control panels,
  • MCC, cabling, cable trays and trunking.
  • Capacitor banks
  • Bus-bar riser
  • Fire alarm system
  • Standby generators and automatic changeover switches;
  • Earthing and lightning protection system
  • Master Antenna TV system
  • 11KV/415V transformers
  • All shop drawings and builder's work drawings
  • All operation and maintenance manuals
Electrical Value: Dhs 4,003,680.00
Peak Manpower: 10

 