Housing Villa Compound at Mohammed Bin Zayed City, Abu Dhabi

Villa Compound at Mohammed Bin Zayed City

Client: International Capital Trading
Main Contractor: Pivot Engineering and General Contracting Company LLC
Consultant: Ewan Architectural Engineering Consultancy
Location: Mohammed Bin Zayed City, Abu Dhabi
Started: April 2009
Completion Date: December 2010
Value: 260,000,000

 

The construction, completion and maintenance of 170 villas at Mohammed Bin Zayed City. All the villas have 2 floors (Ground and First floor). The project scope includes Club House, Swimming Pool, 2 Playgrounds, Multipurpose Hall, Mosque, Substations, Guardhouses, Public Parking Areas, Soil Investigation, Landscape and Boundary Walls and all associated external works.


Civil Details

Total Plot Area: 78,907 m2
Total Built-Up Area: 62,000 m2
Concrete: 30,564 m3
Formwork: 190,108 m2
Rebar: 4,940,059 kg
Blockwork: 108,069 m2
Plastering: 264,279 m2
Tiling Works: 76,426 m2
Civil Value (Dhs.): 188,550,000
Peak Manpower: 1279

 

Mechanical Details

HVAC systems including ducted split units, decorative split units, packaged units and all required exhaust fans and accessories The supply and installation of all plumbing and drainage, including hot and cold water piping with all related accessories. All sanitary fixtures and accessories are supplied and installed. A complete storm water drainage system. A complete fire fighting infrastructure system including DI pipes, fire hydrants and fire cabinets

Mechanical Value (Dhs.): 46,643,480
Peak Manpower: 162

 

Electrical Details

Installation, testing and commissioning of:
Small power and lighting including conduiting, wiring, wiring accessories and lighting fixtures. Power distribution including main distribution boards, sub-main distribution boards, isolators, starters, control panels and cabling.

Electrical Value (Dhs.): 24,806,520
Peak Manpower: 141


Total Manpower: 1582

 