Serena Development - Casa Viva (Phase 3)Value: 315,000,000 AED

Construction of 494 Townhouses; the project consists of 120 clusters with a total built up area of 100,860 sqm. All civil and MEP works are included within the scope.

Read More

150 Club Villas at Dubai HillsValue: 157,509,543 AED

The works comprise the carrying out and completion of the construction of Club Villas (150 Nos.) (PA-07) and the remedying of defects therein.

Read More

Emaar South Development - Urbana II Stacked Townhouses (GA02) Phase 1Value: 170,203,253 AED

Construction of 372 Townhouses located at Plot GA02 in Emaar South Development, Dubai. The project consists of 55 clusters with a total built-up area of 54,903 sqm. All civil and MEP works are included within the scope.

Read More

Emaar South Development - Urbana II Stacked Townhouses (GA05) Phase 1Value: 113,400,000 AED

Construction of 236 townhouses located at Plot GA05 in Emaar South Development, Dubai. The project consists of 41 units with a total built up area of 35,035 sqm. All civil and MEP works are included within the scope.

Read More

Serena Development - Casa Dora (Phase 2)Value: 370,000,000 AED

Construction of 578 Townhomes, Pool House, Gate Hose B. The project consists of 131 clusters with a total built up area of 104,995 sqm. All civil and MEP works are included within the scope.

Read More

Emaar South Development - Urbana II Stacked Townhouses (GA01) Phase 1Value: 146,518,717 AED

Construction of 324 townhouses located at plot GA01 in Emaar South Development, Dubai. The projects consist of 46 clusters with a total built up area of 47,755 sqm. All Civil and MEP works are included within the scope.

Read More

MAMSHA AL SAADIYATValue: 1,250,000,000 AED

Mamsha Al Saadiyat is situated along a pristine 1 2 kilometre beach a few steps away from three of the world’s most iconic museums and Saadiyat’s premier retail destination The District The project consists of the construction of nine residential buildings providing a total number of 461 units including interior fit-out and all external..

Read More

Al Jaddaf Residential BuildingsValue: 73,000,000 AED

Construction of two residential buildings on adjacent plots in Al Jaddaf, Dubai. Both buildings consist of 3B+G+8+Gym providing approximately 20,728 sqm of built-up area.

Read More

Saraya C34 Residential Tower Value: 160,000,000 AED

The project include the construction of a residential tower located in the prestigious Saraya master-planned development located on Abu Dhabi Corniche The building consists of two basement levels providing 234 parking spaces a ground floor mezzanine floor 3 podium levels an amenity floor 32 typical floors and roof floors The building..

Read More

Project Images

Mussafah Gardens DevelopmentValue: 275,000,000 AED

The project is a new development located in Mussafah Abu Dhabi consisting of two residential buildings (G+17) a community center workers accommodation building two substations guard houses car parking and boundary wall The buildings provide 3 bedroom townhouses with private gardens 1 and 2 bedroom apartments and 3 bedroom duplex The..

Read More

Project Images

Al Marasy DevelopmentValue: 420,000,000 AED

The project included enabling works and the construction of eight residential buildings consisting of basement car parking, ground floor and five upper floors; prayer hall; recreational facilities; 54-berth floating dock; hard and soft landscaping; and mechanical, electrical and plumbing works, including substation buildings.

Read More

Project Images

Al Rayanna Residential CommunityValue: 1,416,000,000 AED

The project consists of the enabling and construction works for the basements and the construction of 33 buildings; mosque; boundary wall and guard houses; mechanical electrical and plumbing installations; and the installation of kitchens and wardrobes in the apartments The scope also included the construction of amenities including..

Read More

Project Images

Al Jimi MallValue: 318,000,000 AED

The project is to expand the existing mall to the West and to construct an extension providing an additional 39 207 sqm of built-up area The expansion is planned to make space for new retail spaces restaurants and an entertainment attraction The development includes a strategy to renovate the existing mall with improvements to existing..

Read More

The TerracesValue: 5,790,750 AED

Located at the Arabian Ranches Golf Club, The Terraces consists of approximately 600 sqm of retail floor-space.The scope of works includes the demolition and removal of hard landscaping and the construction of new car parking facilities and associated external works. All civil and MEP works are included within the scope.

Read More

First Avenue Mall and HotelValue: 202,222,222 AED

Pivot was awarded a contract for the construction of a shopping mall consisting of a basement, ground floor and first floor. There are an additional 4 upper floors providing accommodation for a hotel with 147 keys. The total built-up area is 44,418 sqm. The scope of works includes all civil and MEP works.

Read More

Project Images

ADAC T3 Commercial BuildingValue: 52,750,000 AED

The new commercial building is strategically located adjacent to the Premier Inn Hotel at the Terminal 3 Business Park opposite the main departure gate The scope of works include all civil and MEP works for the construction of a commercial building consisting of a basement ground floor four upper floors and a roof floor with a built-up..

Read More

Project Images

Boutik MallValue: 443,500,000 AED

The project included enabling works to construct a luxury shopping mall with basement car parking and double height ceilings Located in Al Oyoun Village in the Al Nagfa area of Al Ain the mall conforms to authority requirements and complements the natural landscape and traditional architectural language of the village Part roof of the..

Read More

Project Images

Barsha Boutique OfficesValue: 94,007,956 AED

The project involved the construction completion commissioning and maintenance of a building that houses the executive offices of Al Barsha Real Estate Company The building features three basement levels a ground floor five stories and a roof level The project involved all civil and electromechanical works for this reinforced-concrete..

Read More

Project Images

Coral Al khoory Hotel ApartmentsValue: 59,500,000 AED

This hotel apartment building is located in Al Barsha, Dubai and comprises two basement levels, a ground floor, six stories and a roof.

Read More

Project Images

Al Diar Capital HotelValue: 41,600,000 AED

Built on a plot size of approximately 17 480 sqm this five-star hotel with 160 rooms and suites features a basement a first floor a second floor 10 typical floors a 13th floor and 14th floor a roof and top roof floor There are restaurants on the ground floor and mezzanine as well as a fully equipped gymnasium and health club on the top..

Read More

Project Images

Cinema at Al Ain Rotana HotelValue: 8,354,051 AED

The project involved construction of a four-theatre cinemaat the Al AinRotana Hotel which is located on the basement and ground floors of the hotel.The scope of works included all civil and electromechanical works.

Read More

Project Images

Al Ain Rotana HotelValue: 53,415,522 AED

This luxury five-star hotel in Al Ainfeatures 102 rooms and suites four apartments and eight chalets The complex includes a ballroom shopping centre health club (with sauna steam room two squash courts and an aerobic gymnasium) swimming pool and tennis courts The hotel hasseveral restaurants and bars and two meeting/conference rooms..

Read More

Project Images

Rawda HotelValue: 18,719,826 AED

The project involved converting a 14-story residential building into a five-star hotel with each floor containing six studio rooms and two one-bedroom suites Internal works included decorations and finishes including painting wallpaper mirrors carpets curtains and furniture for the hotel and main lobby Externally a full exterior curtain..

Read More

Project Images

Baniyas Hotel (Mafraq Hotel)Value: 38,238,044 AED

Pivot provided all civil and electromechanical work for the two-story structure a service building staff accommodation staff recreational facilities engineering workshop health club sauna/Jacuzzi tennis courts local bar and swimming pool This project is a five-star luxury resort hotel with 228 rooms and a total floor area of 11 884 sqm..

Read More

Project Images

Midfield Terminal Landside Support FacilitiesValue: 261,072,360 AED

Construction of a long term car park, goods and waste processor complex facility, airport employee car park, airport employee consolidation centre building, car rental support facility and a taxi support facility.

Read More

MIDFIELD TERMINAL FIRE STATIONValue: 43,000,000 AED

The project is a new fire station located at the new midfield terminal at Abu Dhabi International Airport. The building consists of a ground floor and three upper floors and provides approximately 4,000 sqm of built-up area. Pivot is responsible for all civil, electrical, mechanical and plumbing works including testing and commissioning.

Read More

Mussafah Gardens Infrastructure DevelopmentValue: 12,500,000 AED

The project is a new development located in Mussafah Abu Dhabi consisting of two residential buildings a community center workers accommodation building two substations guard houses car parking and boundary wall Pivot was awarded the following works Demolition; earthworks; enabling works; roadworks and miscellaneous structures;..

Read More

Al Ain Ghareba Infrastructure Project Value: 325,000,000 AED

The project included all infrastructure works to support a new Emirati community consisting of 600 villas with all MEP works (subject to a separate contract). The project is in full compliance with the Clients sustainability objective to achieve 2 Pearls under the Abu Dhabi Urban Planning Council Estidama Pearl Rating System.

Read More

Project Images

Al Sila’a Gharbia Emirati Housing Project - Infrastructure WorksValue: 279,328,000 AED

Al Sila’a Gharbia Emirati Housing Project - Infrastructure Works

Read More

Project Images

5 Primary Substations 33/11KV Value: 20,084,375 AED

The project involved the construction of five 33/11kV substations in Al Ain Pivot provided all civil and electromechanical works for the substations all of which were constructed of poured-concrete elements on a poured foundation of strip footings Each station includes a transformer room switchgear room battery room offices toilets..

Read More

UAE University New CampusValue: 85,450,000 AED

The project comprised four buildings on the new UAE University Campus Public-Private Partnership Development in Al Ain. Buildings 6A and 6B feature a basement and ground-level podium structure, with three floors of offices, a mechanical floor, a basement, ground-floor parking and central landscaped areas.

Read More

Three Mosques in Al ShamkhaValue: 8,274,000 AED

These mosques were constructed to serve communities located in the outlying areas of Abu Dhabi city. The internal finishes include carpeted floors and built-in wooden cupboards in the mosque itself.

Read More

Diwan of His Highness the Crown Prince of Abu DhabiValue: 156,019,491 AED

The Diwan of His Highness the Crown Prince of Abu Dhabi was constructed on a plot size of 58 000 sqm and features patterned marble installed on walls and floors fabric on wall panels and curtains decorative glass and mirrors hand-tufted carpets that are both modern and Persian and gold-plated brass work on railings and balustrades The..

Read More

Project Images

GASCO Remote Area Medical Services ClinicValue: 11,774,252 AED

The single-story clinic has a net area of 621 sqm. The building is divided equally into public areas and treatment areas, with main, emergency and service entrances.

Read More

Supply & Transport Directorate H.Q. and Technical SchoolValue: 225,000,000 AED

The construction of a camp for the armed forces covering 120,000 square meters of built-up area on an area of 1,500,000 square meters.

Read More

Zadco Laboratory BuildingValue: 5,000,000 AED

This laboratory building for Zadco on Saadiyat Island was equipped with a gas-services system consisting of low-pressure gas, nitrogen, oxygen and compressed air. Manifold and gas cylinders were supplied outside the building to avoid explosion of cylinders.

Read More

Khalidiyah Residential TowerValue: 20,900,000 AED

Khalidiyah Residential Tower (4B+G+16+R), PLOT C2, SECTOR W6, Abu Dhabi

Read More

Hotel Staff Accommodation, Warsan 3Value: 112,547,648 AED

Hotel Staff Accommodation on Plot No. 811-1445, Warsan 3

Read More

© 2017 Pivot Engineering & General Contracting Co. (W.L.L)