Cinema at Rotana Al Ain Hotel

Cinema

Client: His Highness Sheikh Tahnoon Bin Mohammed Al Nahyan
Consultant: Al Salaam Consultants
Location: Al Ain, Abu Dhabi
Started: April, 1999
Completed: November, 1999
Value: Dhs 8,354,051

 

The project involved the civil and electro-mechanical works required for the construction of a four-theatre cinema, on the basement and ground floors of the Rotana Al Ain hotel.

Final finishing works were carried out by another contractor.

Civil Value: Dhs 4,931,261.00
Peak Manpower: 0

 

Mechanical Details

Central AC system, including two 98 ton chillers, 22 nos. FCUs and 4 nos. AHUs, modulating AC controls and central fans. Distribution is done by GI sheet ducting and black steel pipes for the chilled cold water PVC distribution system.

Sanitary fixtures.

Ventilation system complete with seven fans, two speed motor, ducts and dampers.

Fire fighting system: Distribution to sprinklers with wet alarm valves, fire fighting pump set, complete with control panel.

Mechanical Value: Dhs 2,552,600.00
Peak Manpower: 6

 

Electrical Details

The supply, installation, testing and commissioning of the power distribution system, including main and submain distribution boards, motor control centres, and capacitor banks.

All control panels, isolators and starters to the miscellaneous AC and mechanical equipment.

Cable trays, PVC and GI trunking.

Standby diesel generator.

Earthing and lightning protection system.

All low voltage and alarm systems such as:
Public address system;
Sound and music system;
Central antenna/satellite TV system.

Electrical Value: Dhs 870,190.00
Peak Manpower: 6

 

Protected Area