| Client: | Sorouh Real Estate |
| Main Contractor: | Pivot Engineering |
| Project Manager: | Turner |
| Consultant: | Ewan Architects and Engineers |
| Location: | Al Ain |
| Started: | November 2008 |
| Completion Date: | May 2011 |
| Value: | 443,500,000 |
The Project consists of the following: Construction of a retail shopping mall, including two Basement floors of car parking, a supermarket, retail shopping and car park on the ground floor, and three floors of retail shopping space. The fourth floor will be devoted to restaurants, a food court, a family entertainment zone, cinemas and terraces.
The project also includes all associated external works, such as hard and soft landscaping, street lighting and internal roads and paving.
Civil Details
| Total Plot Area: | 25,080 m2 |
| Total Built-Up Area: | 128,810 m2 |
| Concrete: | 58,294 m3 |
| Formwork: | 211,530 m2 |
| Rebar: | 9,897,654 kg |
| Blockwork: | 72,123 m2 |
| Plastering: | 119,224 m2 |
| Tiling Works: | 27,545 m2 |
| Elevators/ Travelator: | 36 |
| Civil Value (Dhs.): | 323,500,000 |
| Peak Manpower: | 971 |
Mechanical Details
The supply and installation of all plumbing and drainage, including hot and cold water piping with all related accessories, ground level and roof water tanks and pumps as well the connection to the network. All sanitary fixtures and accessories are supplied and installed.
| Mechanical Value (Dhs.): | 60,518,251 |
| Peak Manpower: | 90 |
Electrical Details
Small power and lighting including distribution boards, conduiting, wiring, wiring accessories and lighting fixtures
| Electrical Value (Dhs.): | 59,481,749 |
| Peak Manpower: | 80 |
| Total Manpower: | 1141 |