ADNOC Ruwais Sulphur Handling Expansion Project

Client Abu Dhabi National Oil Company (ADNOC)
Consultant Technip Geoproduction, France
Location: Ruwais, Abu Dhabi
Started: January, 1995
Finished: June, 1996
Value: Dhs 37,689,242

The main focus of the project was the construction of a large sulphur storage facility. The storage building measures 800m x 70m and rests on seven hundred and sixteen 600mm diameter piles, cast in-situ.

Civil works comprised casting of the piles for the sulphur storage building, frame foundations, stacker reclaimer foundations, shelter foundations and sulphur liquid pits. Enhancing the stability of the soil by means of 3m diameter pits filled with stone.

The project also included construction of a weigh bridge, a maintenance building, preparation of the 103,000 sq. m. of formation level, 98,000 cu.m. of earth filling, 7,000 sq. m. of asphalt paving and installing an underground sewage network.

Works also included landscaping and irrigation, modifications to the control building and modifications to the laboratory. All works were carried out in accordance with ADNOC internal.

Civil Value Dhs 36,948,842.00
Peak Manpower 158

 

Mechanical Details

  • A seventeen ton packaged AC unit for the maintenance building along with all related zone controls and associated works.
  • Modification of AC ducting work to the existing control building.

Mechanical Value Dhs 565,400.00
Peak Manpower 6

 

Electrical Details

  • The supply, installation, testing and commissioning of all electrical general services such as lighting, small power outlets, telephones, etc.
Electrical Value Dhs 175,000.00
Peak Manpower 2

 