Abu Dhabi Int'l Airport: Replacement of Potable Water Pipework

Int'l Airport

Client: Department of Civil Aviation; Abu Dhabi
Consultant: Abu Dhabi Civil Aviation
Location: Abu Dhabi International Airport
Started: December, 1989
Completed: April, 1990
Value: Dhs 1,190,000

 

The project was mainly mechanical in nature, involving the dismantling and replacing of the potable water pipework system, the design and construction of the pump foundations and relocation of the pumps and all necessary civil works.

Civil Value: Dhs 310,300.00
Peak Manpower: 35

 

Mechanical Details

The dismantling of existing steel piping for the following systems:

  • Irrigation piping system
  • Potable water pumping system

The relocation of the pumps. The supply, installation, testing and commissioning of the following systems:

  • By-pass system comprised of glass reinforced epoxy resin pipes,
  • The stripping, sandblasting, and internal coating of two seven cubic metre water tanks. The internal coating was done using fibreglass mats.
  • The main system consists of glass reinforced epoxy resin piping.
Mechanical Value: Dhs 737,800.00
Peak Manpower: 12

 

Electrical Details

All associated electrical works.

Electrical Value: Dhs 141,900.00
Peak Manpower: 2

 

Protected Area