| Client: | Abu Dhabi National Hotels Company |
| Consultant: | Architectural Consulting Group |
| Location: | Abu Dhabi |
| Started: | March, 1993 |
| Completed: | March, 1995 |
| Value: | Dhs 52,111,218 |
The project involved all civil and electro-mechanical works required for the construction of an extension to the existing Hilton Hotel in Abu Dhabi, having a 12 storey tower with 200 rooms, including a new ballroom, restaurants and shopping area. The building is of reinforced concrete on pile foundations of deluxe finishes. The external elevations have a marble stone,curtain wall and claustra blocks finish. The total construction area is 20,900 square meters.
| Civil Value: | Dhs 36,510,609.00 |
| Peak Manpower | 200 |
Mechanical Details
Air conditioning and ventilation: Three 630 ton chillers with 224 air handling units and fan coil units s well as all exhaust/fresh air fans. Distribution is done with GI Plumbing and drainage: All hot and cold water piping with all related accessories, water tanks and pumps as well as all drainage pipes and manholes Fire fighting: Dry risers, halon system, GI piping to all areas, including basement and roof, sprinklers, pumps, fire cabinets, hose reels and fire Kitchen and Laundry equipment: Installation of all the hotel kitchen and laundry equipment, boilers
| Mechanical Value: | Dhs 10,514,643.00 |
| Peak Manpower | 50 |
Electrical Details
Exploration of existing services, including high and low voltage cables, telecom cables and Etisalat telephone cables and preparation of all required drawings for rerouting the services. Laying of new high and low voltage cables and telephone cables, testing of all cables according to ADMA-OPCO specifications, followed by splicing and diverting the power. Preparation of detailed AutoCAD drawings for installation and testing of two new sewage pumps with control panel, all according to ADMA-OPCO specifications and procedures. Small power and lighting, earthing and lightning protection, addressable fire alarm system, MATV system, music system, PA system, UPS system and telephone system. enerator, lifts, UPS system, distribution transformer.
| Electrical Value | Dhs 5,085,966.00 |
| Peak manpower | 12 |