| Client: | EMKE Group |
| Consultant: | National Engineering Bureau |
| Location: | Al Barsha, Dubai |
| Started: | December 2004 |
| Completed: | June 2006 |
| Value: | Dhs 65,000,000 |
A shopping mall with ground and two upper floors. Construction is of reinforced concrete with block work walls, floor, wall and ceiling finishes, mechanical ventilation, air-conditioning, electrical, plumbing and drainage works.
| Civil Value: | Dhs 55,497,696.00 |
| Peak Manpower: | 443 |
Mechanical Details
| Mechanical Value: | Dhs 7,162,400.00 |
| Peak Manpower: | 60 |
Electrical Details
| Electrical Value: | Dhs 2,338,064.00 |
| Peak Manpower: | 45 |