Construction of 2B+G+M+1 Floors Bank Building

Floors Bank

Client: First Gulf Bank
Consultant: National Engineering Bureau
Location: Al Quoz Ind. III, Dubai
Started: June 2006
Completed: June 2007
Value: Dhs 39,000,000

 

The construction, completion and maintenance of a reinforced concrete building with two basements, ground, mezzanine and one floor, with block walls, aluminium double glazed windows, floor, wall and ceiling finishes, and all associated external works.

The approximate built-up area of the project is 173, 610 square feet.

Civil Value: Dhs 26,050.00
Peak Manpower: 145

 

Mechanical Details

The mechanical works for the project feature the following:

  • A complete HVAC system, complete with two 236 TR chillers, all required FAHUs, AHUs and FCUs, smoke fans and exhaust fans, AC
  • Complete fresh water supply and drainage system, including 19 water heaters, five water tanks, all necessary transfer pumps, booster pumps and submersible pumps and accessories, and
  • A fire fighting system including all sprinklers, hoses, fire cabinets and accessories.
  • The latest model of building management system.
Mechanical Value: Dhs 8,000,000.00
Peak Manpower: 38

 

Electrical Details

Installation, testing and commissioning of:

  • Power distribution including main distribution boards, sub-main
  • distribution boards, isolators, starters and control panels, cabling,
  • cable trays and trunking
  • Earthing and lightning protection system
  • CCTV system / Access control / Burglar system
  • Fire Alarm system
  • Shop drawings and builders work drawings
  • Operation and maintenance manuals and as-built drawings
Electrical Value: Dhs 4,950,000.00
Peak Manpower: 16

 