87 Villa Compound: Abu Dhabi

87 Villa Compound

Client: First Gulf Bank
Consultant: Ewan Architectural and Engineering Consultancy
Location: Abu Dhabi
Started: October, 2004
Completed: May, 2006
Value: Dhs 94,725,000

 

The construction, completion, and maintenance of 87 residential villas, clubhouse, swimming pool and recreational facilities, and all associated external works.

Civil Value: Dhs 55,430,010.00
Peak Manpower: 450

 

Mechanical Details

  • The supply and installation of all plumbing and drainage, including hot and cold water piping with all related accessories, ground level and roof water tanks and pumps.
  • All sanitary fixtures and accessories are supplied and installed.
  • The supply and installation of complete HVAC systems for all the villas, including 720 ducted split units, controls, air outlets, and ducting.
  • Supply and installation of all mechanical works for the clubhouse and swimming pool.
  • External works including water supply, drainage, and storm water.
Mechanical Value: Dhs 9,479,990.00
Peak Manpower: 80

 

Electrical Details

  • Small power and lighting including distribution boards, conduiting, wiring, wiring accessories and lighting fixtures.
  • External high and low voltage supply systems.
Electrical Value: Dhs 7,590,000.00
Peak Manpower: 65

 