| Client: | ADWEA |
| Consultant: | SwedPower |
| Location: | Al Ain |
| Started: | August, 2004 |
| Completed: | June, 2006 |
| Value: | Dhs 20,084,375 |
The construction of five substations in Al Ain, Abu Dhabi. Each substation is approximately 30 by 30 metres. The stations are constructed from poured concrete elements on a poured foundation of strip footings.
Each station includes a transformer room, switchgear room, battery room, offices, toilets and a basement. Steel and aluminium doors are provided for each substation
| Civil Value: | Dhs 18,884,375.00 |
| Peak Manpower: | 230 |
Mechanical Details
There is no major mechanical work in the scope of the project.
| Mechanical Value: | Dhs 0.00 |
| Peak Manpower: | 0 |
Electrical Details
Small power and lighting including conduiting, wiring, wiring accessories and lighting fixtures
| Electrical Value: | Dhs 1,200,000.00 |
| Peak Manpower: | 30 |