| Client: | Abu Dhabi Municipality |
| Consultant: | Gulf Engineering Group |
| Location: | Adla-Sweihan, Abu Dhabi |
| Started: | August, 2003 |
| Completed: | January, 2004 |
| Value: | Dhs 11,000,000 |
The construction of housing units in the outlying area of Abu Dhabi city.
Each villa is comprised of two storeys and has a total floor area of 550 m2. The construction is cast-in-situ concrete. Depending upon the existing ground conditions, each unit is built on piles or a raft foundation.
The villas are situated on plots of 46 by 46 metres, enclosed by an external boundary wall constructed from pre-cast GRC panels.
| Civil Value: | Dhs 9,780,000.00 |
| Peak Manpower: | 40 |
Mechanical Details
The supply and installation of all plumbing and drainage, including hot and cold water piping with all related accessories, ground level and roof water tanks and pumps
All sanitary fixtures and accessories are supplied and installed.
Split unit AC is provided.
| Mechanical Value: | Dhs 620,000.00 |
| Peak Manpower: | 8 |
Electrical Details
Small power and lighting including conduiting, wiring, wiring accessories and lighting fixtures
| Electrical Value: | Dhs 600,000.00 |
| Peak Manpower: | 5 |