| Client: | HH Sheikh Zayed Private Department |
| Consultant: | AEC |
| Location: | Abu Dhabi |
| Started: | August, 2002 |
| Completed: | June, 2004 |
| Value: | Dhs 39,000,000 |
The project involves all civil and electro-mechanical work required for the construction of two multi-storey concrete buildings near the new Khalifa Park development in Abu Dhabi.
The buildings are constructed on piles and share a common basement. They occupy a plot of 105 m x 35 m while each building occupies 49 m x 28 m and has total floor area of approximately 10,000 m2.
| Civil Value: | Dhs 29,000,000.00 |
| Peak Manpower: | 235 |
Mechanical Details
The supply and installation of all plumbing and drainage, including hot and cold water piping with all related accessories, ground level and roof water tanks and pumps.
All sanitary fixtures and accessories are supplied and installed.
| Mechanical Value: | Dhs 6,000,000.00 |
| Peak Manpower: | 35 |
Electrical Details
Small power and lighting including conduiting, wiring, wiring accessories and lighting fixtures.
| Electrical Value: | Dhs 4,000,000.00 |
| Peak Manpower: | 35 |